Coal Seam Gas – Field Gas Flare System

Senex Energy required a packaged and installed CSG flare for its field development. Wasco designed, procured, partially fabricated and installed the flare package that now operates at the site. A second matching unit was also provided by Wasco and it will be installed during 2017 as Senex continues to develop coal seam gas fields.

Coal Seam Gas – EPC delivery Central Queensland

Through 2016 Wasco has delivered over 20 gas well connections for Westside Corporation near Moura in Central Queensland. Wasco provides full EPC services from well pad layout through polyethylene gathering pipeline and associated infrastructure design, supply and construction services. Services include placement and commissioning of well site equipment as well as buried infrastructure.